TRUE/FALSE

13.1    PERT and CPM are quantitative analysis tools designed to schedule and control large projects.


13.2    PERT is a deterministic analysis tool allowing for precise times of activities within a project.


13.3    PERT had its beginnings in a military department of the United States.


13.4    CPM is a probabilistic analysis of managing a project.

13.5    An event is a point in time that marks the beginning or ending of an activity.

13.6    A network is a graphical display of a project that contains both activities and events.

13.7    The optimistic time is the greatest amount of time that could be required to complete an activity.

    

13.8    PERT is a network technique similar to CPM, but PERT allows for project crashing.

    

13.9    The most likely completion time of an activity is used to represent that activity’s time within a project.

13.10    The expected completion time and variance of an activity is approximated by the normal distribution in a PERT analysis.

13.11    PERT was developed for a project for which activity or task times were uncertain.

13.12    CPM was developed for use in managing projects which are repeated and about which we have good information as to activity or task completion times.

    

13.13    With PERT, we are able to calculate the probability of finishing the project on a particular day.

    

13.14    With CPM, we are able to calculate the probability of finishing the project on a particular day.


13.15    A PERT or CPM network shows activities and activity sequences.

    

13.16    One of the most difficult aspects of using PERT is defining the activities so that they have measurable/observable starts and finishes.

13.17    Before drawing a PERT or CPM network, we must identify each activity and their predecessors.


13.18    The three time estimates employed in PERT are: optimistic time, average time, and pessimistic time.

13.19    In the PERT process, if an activity has zero variance it must be on the critical path.


13.20    Given the variability of the activity completion time, the original critical path we identify in our PERT analysis may not always be the actual critical path as the project takes place.


13.21    In PERT, the activity completion times are modeled using the beta distribution.


13.22    In PERT, the earliest finish time in one activity will always be the earliest start time of the following activity.


13.23    In PERT, the earliest start time for an activity is equal to the latest of the earliest finish times of all of its immediate predecessors.


13.24    One of the limiting assumptions of PERT is that for any activity to start, all of its immediate predecessors must be complete.


13.25    One of the limiting assumptions of PERT is that all activities must be completed at some time during the project.

13.26    One of the most significant benefits of PERT is that it forces the project manager to sit down and plan the project in great detail – and thus come to an understanding of relationships between the activities.


13.27    Slack is the time an activity can be delayed without impacting the completion time of the project.

13.28    It is never possible to delay an activity without impacting the project completion time.


13.29    The variance of the project completion time is equal to the sum of the variances of all the activities.

13.30    In PERT, we assume that the project completion time can be modeled by the normal distribution.


13.31    One PERT/COST assumption is that money is spent at a constant rate over the time taken to complete an activity.

13.32    PERT helps the project manager understand both which activities must take place and which funds must be expended.


13.33    A limitation of PERT/COST is the assumption that money is spent at a constant rate over the time taken to complete the project.

13.34    In CPM, we assume that the cost to complete the task is a linear function of the time to complete the task.


13.35    In CPM, crashing an activity which is not on the critical path increases the cost of the project.


13.36    In CPM, if we are going to crash an activity, we should crash it to the maximum extent possible.


*13.37    In CPM, crashing an activity which is not on the critical path reduces the cost of the project just as much as crashing one on the critical path.


*13.38    One of the drawbacks to using either CPM or PERT to manage an actual project is the amount of data that must be collected over the life of the project to implement either method.


*13.39    In PERT, the variance in completion time is equal to the variance of the most time consuming activity on the critical path.

*13.40    Given the assumptions in PERT, the probability that a project will be completed in less time than required by the activities on the critical path is approximately 50%.

*13.41    One should always wait until an activity’s latest start time before commencing the activity.

    

*13.42    Using PERT/COST, one is able to complete the project for less money than using PERT alone.


*13.43    If an activity has 4 days of slack, and we delay it 2 days, the project will also be delayed two days.


*13.44    Gantt and PERT charts provide the same information, just in different formats.


*13.45    Gantt charts contain information as to the time taken by each activity, but not the sequential dependencies of the activities.


*13.46    Using PERT/COST as a management tool, it is always possible to bring a project in under budget.
 

Available Answer
$ 30.00

[Solved] ACC 501 Project Management CHAPTER 13 (TRUE/FALSE SOLUTION)

  • This solution is not purchased yet.
  • Submitted On 01 Jun, 2016 10:12:04
Answer posted by
Online Tutor Profile
solution
TRUE/FALSE 13.1 PERT and CPM are quantitative analysis tools designed to schedule and control large projects. 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. 13.3 PERT had its beginnings in a military department of the United States. 13.4 CPM is a probabilistic analysis of managing a project. 13.5 An event is a point in time that marks the beginning or ending of an activity. 13.6 A network is a graphical display of a project that contains both activities and events. 13.7 The optimistic time is the greatest amount of time that could be required to complete an activity. 13.8 PERT is a network technique similar to CPM, but PERT allows for project crashing. 13.9 The most likely completion time of an activity is used to represent that activity’s time within a project. 13.10 The expected completion time and variance of an activity is approximated by the normal distribution in a PERT analysis. 13.11 PERT was developed for a project for which activity or task times were uncertain. 13.12 CPM was developed for use in managing projects which are repeated and about which we have good information as to activity or task completion times. 13.13 With PERT, we are able to calculate the probability of finishing the project on a particular day. 13.14 With CP...
Buy now to view the complete solution
Other Similar Questions
User Profile
Halsey

ACC 501 Project Management CHAPTER 13 (PROBLEMS&ESSAY/ANSWER)

PROBLEMS 13.132 Draw the PERT network associated with the following activities. Immediate Predecessor A - B A C A D B E B F C G D H E, F ANSWER: 13.133 Given: Activity Optimistic Most Likely Pessimistic A...
User Profile
Halsey

ACC 501 Project Management CHAPTER 13 (MULTIPLE CHOICE SOLUTION)

MULTIPLE CHOICE 13.47 The critical path of a network is the (a) shortest time path through the network. (b) path with the fewest activities. (c) path with the most activities. (d) longest time path through the network. ...
User Profile
Halsey

ACC 501 Project Management CHAPTER 13 (TRUE/FALSE SOLUTION)

TRUE/FALSE 13.1 PERT and CPM are quantitative analysis tools designed to schedule and control large projects. 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. 13.3 PER...
User Profile
Halsey

ACC 501 Project Management CHAPTER 13 COMPLETE SOLUTION (T/F; MULTIPLE CHOICE; PROBLEMS; ESSAY/ANSW)

TRUE/FALSE 13.1 PERT and CPM are quantitative analysis tools designed to schedule and control large projects. 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. 13.3 PER...

The benefits of buying study notes from CourseMerits

homeworkhelptime
Assurance Of Timely Delivery
We value your patience, and to ensure you always receive your homework help within the promised time, our dedicated team of tutors begins their work as soon as the request arrives.
tutoring
Best Price In The Market
All the services that are available on our page cost only a nominal amount of money. In fact, the prices are lower than the industry standards. You can always expect value for money from us.
tutorsupport
Uninterrupted 24/7 Support
Our customer support wing remains online 24x7 to provide you seamless assistance. Also, when you post a query or a request here, you can expect an immediate response from our side.
closebutton

$ 629.35