Kaplan University Assignment Grading Rubric
______________________________________________________
You have finally reached the installation phase and there are a few criteria you need to address. You need a testing plan that includes unit integration and system testing. This is the time emphasize the importance of careful documentation. You also need to draft a message that explains the installation process and includes guidelines for all concerned. The last step this week is to draft a data conversion plan and a changeover method for TIMS. You need to design a plan for post-implementation review, including fact-gathering methods, topics to cover, the timing of the review, and who should perform it.
Please develop the following:
1. Create a testing plan that includes unit integration and system testing. Ensure the criteria is carefully documented.
2. Explain the installation process and include guidelines for all concerned.
3. Develop a data conversion plan and a changeover method for TIMS. Include the plan for post-implementation review, including fact-gathering methods, topics to cover, the timing of the review, and who should perform it.
Review the grading rubric below before beginning this activity.
Unit 9 Assignment grading rubric =50 points Criteria
Points possible
Points earned by student
1. Create a testing plan that includes unit integration and system testing. Ensure the criteria is carefully documented.
0-15
2. Explain the installation process and include guidelines for all concerned.
0-15
3. Develop a data conversion plan and a changeover method for TIMS. Include the plan for post-implementation review, including fact-gathering methods, topics to cover, the timing of the review, and who should perform it.
0-20
Total (Sum of all points)
0-50
[Solved] IT460 Unit 9 Managing Systems Implementation and Security complete solutions correct answers key
- This Solution has been Purchased 2 time
- Submitted On 06 Apr, 2016 02:34:13
- Vpqnrqhwk
- Rating : 40
- Grade : A+
- Questions : 2
- Solutions : 1079
- Blog : 0
- Earned : $19352.58