Problem 10-28

The following is a control chart for the average number of minor errors in 22 service reports.

    

   
 a.

Calculate the observed mean, expected mean, standard deviation and z value for the median and up/down test. (Negative amounts should be indicated by a minus sign. Round your answers to 2 decimal places.)

    

Test       Observed       Expected       Std. dev         z

Median  

Up/Down  

    

b.Based on your calculation conclude whether the test is random or non-random.

    

TestConclusion             

  Median  

  Up/Down  

Problem 10-25

 

An appliance manufacturer wants to contract with a repair shop to handle authorized repairs in Indianapolis. The company has set an acceptable range of repair time of 50 minutes to 90 minutes. Two firms have submitted bids for the work. In test trials, one firm had a mean repair time of 74 minutes with a standard deviation of 4.0 minutes and the other firm had a mean repair time of 72 minutes with a standard deviation of 5.1 minutes. (Do not round intermediate calculations. Round your answers to 2 decimal places.)


 

Firm             Cpk

1  

2  


 

Which firm would you choose?


 

Firm 1

Firm 2

None

 

Problem 10-23

Suppose your manager presents you with the following information about machines that could be used for a job, and wants your recommendation on which one to choose. The specification width is .48 mm. In this instance, you can narrow the set of choices, but you probably wouldn’t make a recommendation without an additional piece of information. (Round your answers to 3 decimal places.)

     
 

MachineCost per
Unit ($)Standard Deviation (mm)

A16.051

B12.060

C12.070

D10.062

     
 

Process                Cp

A  

B  

C  

D  

     
 

  We can narrow the choices to processes

 

.

 

Problem 10-21

A process that produces computer chips has a mean of .04 defective chip and a standard deviation of .003 chip. The allowable variation is from .031 to .049 defective.


 

a.

Compute the capability index (Cp) for the process. (Round your intermediate calculations to 3 decimal places and final answer to 2 decimal places.)


 

  Capability index  


 

b.Is the process capable?

  

 

Yes

No

 

 

 

Problem 10-2

An automatic filling machine is used to fill 1-liter bottles of cola. The machine’s output is approximately normal with a mean of .94 liter and a standard deviation of .03 liter. Output is monitored using means of samples of 28 observations. Use Table-A.


 

a.

Determine upper and lower control limits that will include roughly 97 percent of the sample means when the process is in control. (Do not round intermediate calculations. Round your answers to 4 decimal places.)


 

  

  Upper control limits: liter  

  Lower control limits: liter  


 

b.

Given these sample means: 1.005, 1.001, .998, 1.002, .995, and .999, is the process in control?

  

 

Yes

No

 

 

 

 

 

Available Answer
$ 30.00

[Solved] Problem 10-28 The following is a control chart

  • This solution is not purchased yet.
  • Submitted On 25 Sep, 2015 11:28:08
Answer posted by
Online Tutor Profile
solution
Problem 10-28 The following is a control chart for the average number of minor errors in 22 service reports. Picture a. Calculate the observed mean, expected mean, standard deviation and z value for the median and up/down test. (Negative amounts should be indicated by a minus sign. Round your answers to 2 decimal places.) Test Observed Expected Std. dev z Median Up/Down b. Based on your calculation conclude whether the test is random or non-random. Test Conclusion Median Up/Down Problem 10-25 An appliance manufacturer wants to contract with a repair shop to handle authorized repairs in Indianapolis. The company has set an accept...
Buy now to view the complete solution
Other Similar Questions
User Profile
Quali...

ECON 213 PROBLEM 1

1 b.) PRICE: ____45.00_________ QUANTITY: _______7________ Please find the solution attached. Thank you....
User Profile
termp...

ACC650_T8.docx Problem 14 - 47 Closing an Unprofitable Department Grand Canyon Univers

ACC650_T8.docx Problem 14 - 47 Closing an Unprofitable Department Grand Canyon University: ACC650 Exercise 14 – 47 1.According to the calculations provided below Tipton should not close the wallpaper operations. ...
User Profile
termp...

ACC650_T6.docx Problem 12-41 Designating Responsibility Centers and Problem 13-42 ROI a

ACC650_T6.docx Problem 12-41 Designating Responsibility Centers and Problem 13-42 ROI and Residual Income Grand Canyon University: ACC650 Problem 12-41 Designating Responsibility Centers To: Waikiki Sands Hotel General ...
User Profile
Beam7...

Problem 16-13 (Algorithmic) The wedding date for a couple is quickly approaching

Please see attached Thank you!............................
User Profile
Tutor...

Problem 1 Estimate the daily carbon utilization to remove chlorobenzene from 1 million gal/day of

Problem 1 Estimate the daily carbon utilization to remove chlorobenzene from 1 million gal/day of groundwater saturated with chlorobenzene. Assume a chlorobenzene concentration of 5...

The benefits of buying study notes from CourseMerits

homeworkhelptime
Assurance Of Timely Delivery
We value your patience, and to ensure you always receive your homework help within the promised time, our dedicated team of tutors begins their work as soon as the request arrives.
tutoring
Best Price In The Market
All the services that are available on our page cost only a nominal amount of money. In fact, the prices are lower than the industry standards. You can always expect value for money from us.
tutorsupport
Uninterrupted 24/7 Support
Our customer support wing remains online 24x7 to provide you seamless assistance. Also, when you post a query or a request here, you can expect an immediate response from our side.
closebutton

$ 629.35