OPS571 Final Exam
- Kimwood
- Rating : 19
- Grade : A-
- Questions : 3
- Solutions : 1123
- Blog : 1
- Earned : $4556.37
1.Which of the following is considered a major process flow structure?
- Lead Time
- Fabrication
- Lean Manufacturing
- Project
2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?
- Certification is sought by any firm assuming they pay annual dues.
- 2nd Party – where a customer audits its supplier
- 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor
- 1st Party – where a firm audits itself against ISO standards
3.Which of the following is ISO 14000 primarily concerned with?
- Quality management
- Time management
- Continuous improvement management
- Environmental management
4. Which is the one correct value stream principle?
- Look for efficiencies in the factory, office, physical, procedural, and technical operations.
- Eliminate waste that stops, slows down, or diverts the value stream.
- Concentrate on speeding up value-adding operations rather than removing waste.
- Keep the value stream moving at minimum velocity.
5. What is the starting point in developing a capacity plan for a health care operation?
- Determining the effective capacity over time
- Estimating design capacity
- Forecasting patient demand for a reasonable length of time
- Discovery of the bottleneck operation
6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?
- MRP (Material Requirements Plan)
- ERP (Enterprise Resource Planning)
- MPS (Master Production Schedule)
- WBS (Work Breakdown Structure)
7.Which of the following is an element that addresses elimination of waste under lean production?
- Kanban production control system
- Production ahead of demand
- Minimized run times
- Group plant loading technology
8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?
[Solved] OPS571 Final Exam
- This solution is not purchased yet.
- Submitted On 13 Jul, 2015 06:35:53
- Kimwood
- Rating : 19
- Grade : A-
- Questions : 3
- Solutions : 1123
- Blog : 1
- Earned : $4556.37