NETW310 Week 2 Lab Report complete solution correct answer key
- Vpqnrqhwk
- Rating : 40
- Grade : A+
- Questions : 2
- Solutions : 1079
- Blog : 0
- Earned : $19352.58
NETW310 Week 2 Lab Report complete solution correct answer key
To complete your Week 2 Lab Report, answer the ten questions concerning the procedure involved and the advantage of wiring standards.
Create your report using the template starting on page 2 and submit it to the Week 2 Dropbox by the due date.
NETW310,
Lab #2, Terminating Category 5e and Category 6 UTP Cable
Lab Report
Each answer is worth seven points.
Use a red colored font for you answers.
Place the answers below the questions.
1. In the videos you just watched where is the color code to use for the jack shown?
2. For the wires how many possible termination color code methods are there?
3. How many wires are there in a UTP cable?
4. What colors are used on these wires?
5. The punch down tool used to insert the wires into a jack such as this does what two things to each wire?
6. What is the most critical part of the termination procedure to ensure low crosstalk on the connection?
7. How is the outer insulation covering each wire cut through during the termination procedure?
8. Which termination color code method is used in this example?
9. In which video is the wire separation tower shown?
10. Where are the pin numbers shown on the jack with the wire separation towers?
[Solved] NETW310 Week 2 Lab Report complete solution correct answer key
- This solution is not purchased yet.
- Submitted On 13 Jul, 2015 01:42:56
- Vpqnrqhwk
- Rating : 40
- Grade : A+
- Questions : 2
- Solutions : 1079
- Blog : 0
- Earned : $19352.58
NETW310 Week 3 Lab Report | Complete Lab Report | Rated A+ 2
This tutorial is rated A+ previously,if you have any question than you can contact me.
...