Cash-back offer from May 2nd to 7th, 2024: Get a flat 10% cash-back credited to your account for a minimum transaction of $50.Post Your Questions Today!

Question DetailsNormal
$ 12.00

Excel Project 3 – MS Excel | Complete Solution

Question posted by
Online Tutor Profile
request


Excel Project 3 – MS Excel
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title Excel Project 3. Click on Show Rubrics if the rubric is not already displayed.
Summary
Create a Microsoft Excel file with four worksheets that provides extensive use of Excel capabilities for charting. The charts will be copied into a Microsoft PowerPoint file and the student will develop appropriate findings and recommendations based on analysis of the data.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in downtown. It has been operating since 2015 and each location summarizes its car rental revenue quarterly. Both locations rent two classes of
cars: economy and premium. Rental revenue is maintained separately for the two classes of rental vehicles.
The data for this case resides in the file Excel Project 3-data.txt and can be downloaded by clicking on the Assignments tab, then on the data tile name. It is a text file (with the file type .txt).
Do not create your own data, you must use the data provided and only the data provided. Element
Requirement Points
Allocated Comments
#
1
1 - Open Excel and save a blank workbook with
the following name:
0.2
Use Print Preview to review how the first worksheet would print.
a.“Student’s First InitialLast Name Excel Project 3” Example: JSmith Excel Project 3
b. Set Page Layout to Landscape
2 Change the name of the worksheet to Analysis by. 0.1

3 a. In the Analysis by worksheet, enter the four labels vertically in column A in the following order: Name:, Class/Section:, Project:, Date Due: 0.3 Use the following text format:
b. with a row between each label, please note the colon, (:) , after each label. Arial 10 point Bold
It may be necessary to adjust the column width so the four labels are clearly visible. Align values Right in the cell

4 a. In the Analysis by worksheet, with all entries in column C, enter the appropriate values for Name, Class and Section, Project, Date Due.
0.3 Use the following text format: It may be necessary to adjust the column width so the four labels are clearly visible. Arial 10 point Bold b. formatting Align values left in the cells

5a. Create three new worksheets: Data, Slide 2, Slide 3. Upon completion, there should be Analysis by as well as the three newly created worksheets. 0.4 b. Delete any other worksheets.

6 If necessary, reorder the four worksheets so theyare in the following order: Analysis by, Data, Slide 2, Slide 3. 0.1

7 a. In the Data worksheet, import the text file Excel Project 3.txt. 0.5 The field names should be in the top row of the worksheet with the data directly under it in rows. This action may not be necessary as this is part of the Excel table creation process. The data should begin in Column A.

8 a. In the Data worksheet, create an Excel table
with the recently imported data.
0.6 Some adjustment may be necessary to column widths to ensure all field names and all data are readable (not truncated or obscured).
b. Pick a style with the styles group to format the table.
c. The style should highlight the field names in the first row.
d. Ensure NO blank spaces are part of the specified data range. Ensure the table has headers. e. Ensure that Header Row and Banded Rows are selected in the Table Style Options Group Box. f. Do NOT check the Total Row.

9 In the Data worksheet, delete rows that contain 2015 data as well as 2017 data. The resulting table should consist of Row 1labels followed by 2016 data, with NO empty cell rows within the table. 0.2 10
a. In the Data worksheet, select the entire table
(data and headers) using a mouse. 0.1
b. Copy the table to the both the Slide 2 as well as the Slide 3 worksheets.
c. The upper lefthand corner of the header/data should be in cell A1.
d. Adjust columns widths if necessary to ensure all data and field names are readable.

11 In the Slide 2 worksheet, based solely on the 2016 data: a. Create a Pivot Table that provides a quarterly breakdown (columns) of the number of car  rentals by car class (rows). Totals for rows and columns should be included. Numerical format with no decimal places and 12 Arial normal for the entire pivot table. Place the pivot table two rows below the data beginning in column A. b. Create a Pivot Table that provides a quarterly breakdown (columns) of number the of cars\ rentals by location (rows). Totals for rows and columns should be included. Numerical format with no decimal places and 12 Arial normal for the entire pivot table. Place this pivot table two rows below the above pivot table beginning in column A. 2.0

12 In the Slide 2 worksheet, based solely on the 2016
data:a. Using the pivot table created in 11 a, create  bar chart that displays the number of car rentals by car class for the four 2016 quarters. Ensure both car types and quarters are clearly visible. Position the top of the chart in row 1 and two or three columns to the right of the data table. Use this same type of bar chart throughout this project the remaining three charts.
b. Using the pivot table created in 11 b, create a bar chart that displays the number of car rentals by location for the four 2016 quarters. Ensureboth locations and quarters are clearly visible. Left align this chart with the left side of the first chart and below it. The same type of bar chart should be used throughout this project. 1.6

13 In the Slide 3 worksheet, based solely on the 2016
data:
a. Create a Pivot Table that provides a quarterly breakdown (columns) of the revenue from car rentals by car class (rows). Totals for rows and columns should be included. Numerical format currency with no decimal places and 12 Arial normal for the entire pivot table. Place the pivot table two rows below the data beginning in column A.
b. Create a Pivot Table that provides a quarterly breakdown (columns) of the revenue from cars rentals by location (rows). Totals for rows and columns should be included. Numerical format currency with no decimal places and 12 Arial normal for the entire pivot table. Place this pivot table two rows below the above pivot table beginning in column A. 2.0

14 In the Slide 3 worksheet, based solely on the 2016 data:
a. Using the pivot table created in 13 a, create a bar chart that displays the revenue from car rentals by car class for the four 2016 quarters. Ensure both car types and quarters are clearly visible. Position the top of the chart in row 1 and two or three columns to the right of the data table. The same type of bar chart should be used throughout this project.
b. Using the pivot table created in 13 b, create a bar chart that displays the revenue from car rentals by location for the four 2016 quarters. Ensure both locations and quarters are clearly visible. Left align this chart with the left side of the first chart and below it. The same type of bar chart should be used throughout this project. 1.6

15 Open a new, blank Power Point presentation file. 0.1 Save the Presentation using the following name: “Student’s First Initial Last Name Presentation” Example: JSmith Presentation

16Slide 1: This is your Title Slide. Select an appropriate title and subtitle layout that clearly conveys the purpose of your presentation. Name, Class/Section, and Date Due should be displayed. 0.8 No speaker notes required

17 a. Slide 2: Title this slide "Number of Cars Rented in 2016"
1.1 Use the speaker notes feature to help you discuss the bullet points (four complete sentences minimum) and the charts.
b. Add two charts created in Slide 2 of the Excel file. .
c. The charts should be the same type and equal size and be symmetrically placed on the slide. 
d. A bullet or two explanation of the charts may be included, but is not required if charts are selfexplanatory.

18a. Slide 3: Title this slide "Car Rental Revenue in 2016" 1.1 Use the speaker notes feature to help you discuss the bullet points(four complete sentences minimum) and the charts.
b. Add two charts, created in Slide 3 of the Excel file. c. The charts should be the same type and equal size and be symmetrically placed on the slide.
c. A bullet or two explanation of the charts may be included, but is not required if charts are selfexplanatory.

19 a. Slide 4: Title this slide "And in Conclusion….."
1.1 Use the speaker notes feature to help you discuss the findings and recommendations (four complete sentences).
b. Write and add two major bullets, one for findings and one for recommendations.
c. There should be a minimum of one finding based on slide 2 and one finding based on slide 3. Findings are facts that can be deduced by analyzing the charts. What happened? Trends? for instance. Observations?
d. There should be a minimum of one recommendation based on slide 2 and one recommendation based on slide 3. Recommendations are strategies or suggestions to improve or enhance the business based on the findings above.

20 Add a relevant graphic that enhances the recommendations and conclusions on slide 4. If a photo is used, be sure to cite the source. 0.2

21 Create a footer using "Courtesy of Your Name" so that is shows on all slides including the Title Slide. The text in this footer should be on the left side of the slides IF the theme selected allows. Otherwise let the theme determine the position of this text. 0.2 Replace the words "Your Name" with your actual name.

22 Create a footer for automated Slide Numbers that appears on all slides except the Title Slide. The page number should be on the right side of the slides IF the theme selected allows. Otherwise let the theme determine the position of the page number.
0.2 Depending upon the theme you have chosen, the page number or your name may not appear in the lower portion of the slide. That is ok. Ensure that your name does appear on every slide, but the page numbers start on slide #2. This will involve slightly different steps to accomplish both.

23 Apply a transition scheme to all slides. 0.1 One transition scheme may be used OR different schemes for different slides

24 Apply an animation on at least one slide. The animation may be applied to text or a graphic. 0.1 TOTAL 15.0 Be sure you submit BOTH the Excel file and the PowerPoint file in the appropriate Assignment folder (Excel Project #3).

Available Answer
$ 12.00

[Solved] Excel Project 3 – MS Excel | Complete Solution

  • This solution is not purchased yet.
  • Submitted On 04 Dec, 2017 08:34:03
Answer posted by
Online Tutor Profile
solution
2016 Q2 Airport Premium $6,26,232 3,392 2016 Q2 Downtown Economy $4,88,588 3,551 2016 Q2 Downtown Premium $5,85,156 3,440 20...
Buy now to view the complete solution
Other Similar Questions
User Profile
kimwo...

Assignment 3: Excel Problems

Assignment 3: Excel Problems At the end of each module, you will apply the module’s concepts by completing comprehensive assignments from the textbook. Complete problems P3-43 (p. 185) and P4-38 (p. 252) in your text book. ...
User Profile
Assig...

ACCT 370 Excel Project Part 3

Your assignment is attached. Thanks for purchasing this assignment!...
User Profile
hesig...

FIN 301 Penn State World Campus Final Excel project

FIN 301 Penn State World Campus Final Excel project...
User Profile
joe96

UMUC IFSM 201 Excel Project 2 IFSM 201 7394 Concepts and Applications of Information Technology

UMUC IFSM 201 Excel Project 2 IFSM 201 7394 Concepts and Applications of Information Technology ...
User Profile
newnu...

UMUC IFSM 201 Excel Project 2 IFSM 201 7394 Concepts and Applications of Information Technology

UMUC IFSM 201 Excel Project 2 IFSM 201 7394 Concepts and Applications of Information Technology ...

The benefits of buying study notes from CourseMerits

homeworkhelptime
Assurance Of Timely Delivery
We value your patience, and to ensure you always receive your homework help within the promised time, our dedicated team of tutors begins their work as soon as the request arrives.
tutoring
Best Price In The Market
All the services that are available on our page cost only a nominal amount of money. In fact, the prices are lower than the industry standards. You can always expect value for money from us.
tutorsupport
Uninterrupted 24/7 Support
Our customer support wing remains online 24x7 to provide you seamless assistance. Also, when you post a query or a request here, you can expect an immediate response from our side.
closebutton

$ 629.35