Cash-back offer from May 2nd to 7th, 2024: Get a flat 10% cash-back credited to your account for a minimum transaction of $50.Post Your Questions Today!

Question Details Urgent
$ 50.00

PLEASE HELP ME IT IS URGENT!!!!

  • From Mathematics, Statistics
  • Due on 14 Apr, 2016 06:42:00
  • Asked On 12 Apr, 2016 10:52:22
  • Due date has already passed, but you can still post solutions.
Question posted by
Online Tutor Profile
request

Note: Please this should be done in excel. each senario should be in a new page,

 

Scenario 1: The All Season Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 6.7 hours of wiring and 4.85 hours of drilling. Each fan must go through 4.95 hours of wiring and 5.65 hours of drilling. During the next production period, 310 hours of wiring time are available and up to 335 hours of drilling time may be used. Each air conditioner sold yields a profit of $75.70. Each fan assembled may be sold for a $55.95 profit. (5 points each for a total of 15 points)

 

Question 1: Formulate and solve this LP production mix situation to find the best combination of air conditioners and fans and that yields the highest profit. Feel free to use the Excel template provided or the corner point method.

 

Question 2: Identify the binding constraint of the model.

 

Question 3: Round your Solution Values to a whole number and calculate the profit using the rounded solution.

 

Scenario 2: All Season’s management realizes that it forgot two critical constraints (see Question #1 above). In particular, management decides that there should be a minimum number of air conditioners and fans produced in order to fulfill a contract to a good customer. (5 points each for a total of 15 points)

 

Question 4: If All Season decides that at least 32 air conditioners and 15 fans should be produced, what would be the optimal solution? How much slack is there for each of the four constraints? Use the Excel template provided or the corner point method.

 

Question 5: Identify the binding constraint of the model.

 

Question 6: Round your Solution Values to a whole number and calculate the profit using the rounded solution.

 

Scenario 3: The ABC Corporation manufactures three electrical products; humidifiers, fans and air cleaners. The manufacturing process is composed of three processes: wiring, packaging and assembly. During the next production period, 2250 hours of wiring time are available, 70 hours of packing and up to 1590 hours of assembly time may be used. The following table presents the production requirements per unit: (5 points each for a total of 15 points)

 

Bill of Labor

Product

Wiring

Assembly

Packaging

Humidifiers

2.5 hrs.

3.25 hrs.

1.45 hrs.

Air Cleaners

1.75 hrs.

4.5 hrs.

1.1 hrs.

Fans

2.1 hrs.

2.90 hrs.

1.75 hrs.

 

Standard Costs

Product

Material

Labor

Overhead

Selling Price

Humidifiers

$23.50

$9.50

$28.50

$78.50

Air Cleaners

$28.15

$8.35

$19.75

$74.35

Fans

$8.55

$7.25

$11.25

$44.50

 

Question 7: Formulate and solve this LP production mix situation to find the best combination of air conditioners, humidifiers and fans and that yields the highest profit. Feel free to use the Excel template provided or the corner point method.

 

Question 8: Identify the binding constraint of the model.

 

Question 9:  Round your Solution Values to a whole number and calculate the profit using the rounded solution.

 

Scenario 4:  Management did not like the solution presented in Scenario 3 above and, based on its open order file, placed additional constraints on the model. First there was an open order for at least 20 humidifiers, and 15 air cleaners, which have to be made, additionally after checking the inventory decided that 10 additional fans should be made. (5 points each for a total of 15 points)

 

Question 10: Formulate and solve this LP production mix situation to find the best combination of air conditioners, humidifiers and fans and that yields the highest profit. Feel free to use the Excel template provided or the corner point method.

 

Question 11: Identify the binding constraint of the model.

 

Question 12: Round your Solution Values to a whole number and calculate the profit using the rounded solution.

 

Scenario 5:  Using the data and constraints presented in Scenarios 3 & 4 and the fact that have hired two additional people to work in the Packaging Department which adds 80 hours to the time available and the constraint that no more than 25 humidifiers could be produced:  (5 points each for a total of 10 points)

 

Question 13: Formulate and solve this LP production mix situation to find the best combination of air conditioners, humidifiers and fans and that yields the greatest profit. Feel free to use the Excel template provided or the corner point method.

 

Question 14: Round your Solution Values to a whole number and calculate the cost using the rounded solution.

 

Scenario 6: The ABC Corporation management has hired a cost accountant to make some recommendations regarding the cost allocation of labor used to produce air cleaners. The average wages of personnel performing particular processes are presented in the table below.

 

Assembly

Wiring

Packaging

Material Handling

$13.25

$15.10

$9.75

$13.10

 

Additional investigation into manufacturing costs reveal that at least 20% of the man-hours must be allocated to performing material handling tasks, 50% must be allocated to wiring and assembly and 30% must be allocated to wiring and packaging. If a block of 55 man-hours is analyzed answer the following questions: (5 points each for a total of 15 points)

 

Question 15: Formulate and develop a LP model to find the best combination of labor hours and that yields the lowest cost. Feel free to use the Excel template provided or the corner point method.

 

Question 16: The prior analysis revealed a flaw in the data; the accountants ignored the constraint that a minimum of fifteen (15) man-hours had to be allocated to Wiring. Formulate and develop a LP model accounting for this new constraint.

 

Question 17: The prior analysis revealed another flaw in the analysis; the accountants failed to identify that packaging is over allocated thus they want to add another constraint stating that packaging must be allocated a maximum of twelve (12) man-hours. Formulate and develop a LP model accounting for this new constraint.

 

 

 

Available Answers
$ 50.00

[Solved] Linear Programming Models

  • This Solution has been Purchased 1 time
  • Submitted On 13 Apr, 2016 06:23:48
Answer posted by
Online Tutor Profile
solution
Scenario 1: The All Season Corporation manufactures two electrical products: air condit...
Buy now to view the complete solution
$ 50.00

[Solved] LP solved in Excel

  • This Solution has been Purchased 1 time
  • Submitted On 13 Apr, 2016 09:14:11
Answer posted by
Online Tutor Profile
solution
Attached is the excel ...
Buy now to view the complete solution
Other Related Questions
User Profile
Calil...
User Profile
Calil...
User Profile
Calil...

The benefits of buying study notes from CourseMerits

Assurance Of Timely Delivery
We value your patience, and to ensure you always receive your homework help within the promised time, our dedicated team of tutors begins their work as soon as the request arrives.
Best Price In The Market
All the services that are available on our page cost only a nominal amount of money. In fact, the prices are lower than the industry standards. You can always expect value for money from us.
Uninterrupted 24/7 Support
Our customer support wing remains online 24x7 to provide you seamless assistance. Also, when you post a query or a request here, you can expect an immediate response from our side.
closebutton
Only 45 characters allowed.
closebutton

$ 629.35