Cash-back offer from April 23rd to 27th, 2024: Get a flat 10% cash-back credited to your account for a minimum transaction of $50.Post Your Questions Today!

Question DetailsNormal
$ 18.00

MAT540 Week 8 Assignment 1. Linear Programming Case Study | Complete Solution

Question posted by
Online Tutor Profile
request

Assignment 1. Linear Programming Case Study

Your instructor will assign a linear programming project for this assignment according to the following specifications.

It will be a problem with at least three (3) constraints and at least two (2) decision variables. The problem will be bounded and feasible. It will also have a single optimum solution (in other words, it won’t have alternate optimal solutions). The problem will also include a component that involves sensitivity analysis and the use of the shadow price.

You will be turning in two (2) deliverables, a short writeup of the project and the spreadsheet showing your work.

Writeup.

Your writeup should introduce your solution to the project by describing the problem. Correctly identify what type of problem this is. For example, you should note if the problem is a maximization or minimization problem, as well as identify the resources that constrain the solution. Identify each variable and explain the criteria involved in setting up the model. This should be encapsulated in one (1) or two (2) succinct paragraphs.

After the introductory paragraph, write out the L.P. model for the problem. Include the objective function and all constraints, including any non-negativity constraints. Then, you should present the optimal solution, based on your work in Excel. Explain what the results mean.

Finally, write a paragraph addressing the part of the problem pertaining to sensitivity analysis and shadow price.

Excel.

As previously noted, please set up your problem in Excel and find the solution using Solver. Clearly label the cells in your spreadsheet. You will turn in the entire spreadsheet, showing the setup of the model, and the results

 

Week 8 Assignment 1

Please submit your assignment in a Word file attached with your Excel results. Please make sure to type your answers in your Word file instead of copy pasting them from the Excel worksheet.

Bike Athletic Company is placing an order for bicycles with its supplier. Four models can be ordered: the adult Open Trail, the adult Cityscape, the girl's Sea Sprite, and the boy's Trail Blazer. It is assumed that every bike ordered will be sold, and their profits, respectively, are 30, 25, 22, and 20. There are several conditions that the company needs to worry about. One of these is space to hold the inventory. An adult's bike needs two feet, but a child's bike needs only one foot. The store has 500 feet of space. There are 1200 hours of assembly time available. The child's bike needs 4 hours of assembly time; the Open Trail needs 5 hours and the Cityscape needs 6 hours. The company would like to place an order for at least 275 bikes.

a. Formulate a model for this problem in a Word document. Identify what type of problem this is.(10 points)

b. Solve your model with either Excel or QM for windows. (15 points)

c. How many of each kind of bike should be ordered and what will the profit be?Report     in the Word document. (15 points)

d. In the Word document, report the sensitivity analysis and the shadow price results and interpret them.(20 points)

e. What would the profit and the change in slack variables be if the company had 100 more feet of storage space? Report in a Word document. (12 points)

f. Starting from the original problem, if the profit on the Cityscape increases to $45, will any of the Cityscape bikes be ordered?Report the new answers and the profit in the Word document. (13 points)

g. Over what range of assembly hours is the dual price applicable? Report in the Word document. (13 points)

h. If we require 5 more bikes in inventory, what will happen to the value of the optimal solutioncompare to the original case (both profit and the decision variables)? Report in the Word document. (12 points)

Submissions should include both completed Excel file results and the completed Word document. Incomplete submissions are not accepted.

Available Answer
$ 18.00

[Solved] MAT540 Week 8 Assignment 1. Linear Programming Case Study | Complete Solution

  • This Solution has been Purchased 7 time
  • Average Rating for this solution is A+
  • Submitted On 26 May, 2015 08:55:47
Answer posted by
Online Tutor Profile
solution
Let’s assume they need to order, X1 units of the adult Open Trail, X2 units of the adult Cityscape, X3...
Buy now to view the complete solution
Other Similar Questions
User Profile
Exper...

MAT540 Week 8 Assignment 1. Linear Programming Case Study | Complete Solution

Let’s assume they need to order, X1 units of the adult Open Trail, X2 units of the adult Cityscape, X3 units of the girl's Sea Sprite and X4 units of the boy's Trail Blazer to maximize the profit. Then from the given in...
User Profile
Tutor...

MAT540 Week 9 Quiz 4

MAT540 Week 9 Quiz 4...
User Profile
homew...

MAT540 Week 8 Assignment 1. Linear Programming Case Study Complete Solution

Your instructor will assign a linear programming project for this assignment according to the following specifications. It will be a problem with at least three (3) constraints and at least two (2) decision variables. The pro...
User Profile
maste...

MAT540 Week 8 Quiz 4 2017

Question QUESTION 1 When using a linear programming model to solve the "diet" problem, the objective is generally to maximize profit. True False 2 points Saved QUESTION 2 Fractional relationships between variables are permitt...
User Profile
Halsey

MAT 540 MAT540 Week 10 Homework

1. transportation problem FromTo (cost) 123 A$6$5$5 B1189 C4107 DVFromTo SupplyNote: Blue cells are your decision variables 123Constraint FromTo (cost) 123 A$8$14$8 B6177 C92410 DVFromTo SupplyNote: Blue cells ...

The benefits of buying study notes from CourseMerits

homeworkhelptime
Assurance Of Timely Delivery
We value your patience, and to ensure you always receive your homework help within the promised time, our dedicated team of tutors begins their work as soon as the request arrives.
tutoring
Best Price In The Market
All the services that are available on our page cost only a nominal amount of money. In fact, the prices are lower than the industry standards. You can always expect value for money from us.
tutorsupport
Uninterrupted 24/7 Support
Our customer support wing remains online 24x7 to provide you seamless assistance. Also, when you post a query or a request here, you can expect an immediate response from our side.
closebutton

$ 629.35